People | Business

Adamson Nearing Completion Of $4 Million Electronics Expansion

New 16,500-square-foot electronics production facility incorporates a Fuji high speed PCB assembly line that can place 188,000 components per hour, backed by three levels of Automated Optical Inspection.
Inside the soon-to-be completed Adamson electronics production facility.

Adamson has announced that it is nearing completion of a new 16,500-square-foot electronics production facility that incorporates a Fuji high speed PCB assembly line th at can place 188,000 components per hour, with repeatable accuracy, backed by three levels of Automated Optical Inspection.

The company states that the investment is crucial in both expanding production capacity to meet the demand for its new VGt flagship powered loudspeakers; and the pursuit of high-tech audio manufacturing.

Fuji production equipment is designed for Industry 4.0, with connectivity from design and prototype through New Product Introduction (NPI) and following with integration into ERP. Having transformed from a builder of passive loudspeakers more than 40 years ago into a manufacturer with a focus on the latest manufacturing, Adamson states that it is implementing maximum interconnectivity and a digital transformation of manufacturing processes, including new ERP software.

Adamson

People Top Stories