
| Smaart Impulse & Phase Measurement
Posted by Patrik Arnekvist on September 17, 2001 |
 
1 2
3

|
Hi -
I know there´s a lot of Smaart experts here so here goes
a thought.
When using the delay locator, Smaart assumes that the right delay
setting is at the highest peak of the waveform.
At low frequencies - is that really the right thing to do, I mean
the "waveform" starts at a zero energy level..or? At 40
hz, there is some time between zero and top of the impulse. (Does
Smaart use the same peak as the reference?)
I experimented with it, and did a measurement of a 2 way crossover
going directly into Smaart with no delay applied. Smaart wanted
to delay the low output. Why?
I also couldn´t get a coherent phase response with no delay
on the low output. How does smaart analyse the phase response?
I also wonder what the difference is between 0 deg and 360 deg,
is it only time dependent?
Thanks för your help
Patrik
Reply posted by Paul Tucci on September 17, 2001
- "When using the delay locator, Smaart assumes that the right
delay setting is at the highest peak of the waveform."
For an Impulse Alignment, yes, the peak is the right thing to use.
For a smooth phase through acoustic crossover area alignment, it
may NOT be the right timing. There are choices to be made about
what to do with the info Smaart gives us.
- "At low frequencies, is that really the right thing to do?
I mean the "waveform" starts at a zero energy level..or?"
At 40 hz there is some time between zero and top of the impulse."
Correct, and insightful.
- "I experimented with it, and did a measurement of a 2 way
crossover going directly into Smaart with no delay applied. Smaart
wanted to delay the low output. Why?"
I did this same experiment and scratched my head for months. Its
called group delay. The low pass filter in the crossover causes
some things to happen. Higher frequencies are rolled off at a chosen
db/octave at a certain frequency. That's the understandable part.
The PHASE shift caused by the crossover, and this is just a fact
of life one cannot avoid, is problematic. Yes, it is in fact delaying
the low frequency output. That's why you measured it that way and
that's why Smaart's phase trace was incoherent until you added the
proper delay to synchronize your measurement.
Smaart gives you some good clues to tell you when measurements
are bad. I am parent on duty this Am so I must run. I'm glad to
see all these Smaart questions coming up now. I suggest to the powers
that be that a Smaart-centered live chat is in order. I'll elaborate
more later.
PT
Reply posted by Patrik Arnekvist on September 17, 2001
Thanks for your response.
The thing is also, when I delayed the low output , I got a deep
cancellation at the crossover point, if it all were in phase, why
would that happen?
Patrik
Reply posted by Paul Tucci on September 18, 2001
-"The thing is also, when I delayed the low output , I got
a deep cancellation at the crossover point, if it all were in phase,
why would that happen?"
Your choice of wording is curious. You say Smaart wanted to delay
the low end. Do you mean to say Smaart measured a time difference
between the reference side of your equation and the output of your
xover? That would be normal.
The delay would go on the reference side because you want to have
compare the two when they are synchronous. "Row, row, row,
your boat" vs "gently down the stream" does not a
valid comparison make. Understand the analogy?
If you introduced delay onto the measurement side of the equation,
ie, the low xover out, you made an even more invalid comparison.
This would explain your lack of coherence. You may have created
the transversal equalizer responsible for the notch described by
comparing the same signal to itself, though one is offset in time
at twice the wave period of your notch frequency. That's a mouthful.
Then again, if you didn't include the throughput delay of the digital
(?) xover (approximately one millisecond)in your measurement, a
500 hz notch (1/2 of 1000hz or one millisecond of time) would appear.
Could go either way.
PT
Reply posted by Earl Driggers on September 17, 2001
Keeping in mind that phase is time and time is phase, by delaying
the low output the relative phase between the two outputs is probably
180^( or close ) now.
Another thing to keep in mind is that phase/time misallignment
will only effect the frequencies common to both outputs. Now that
the delay time is correct on the outputs, having to invert the phase
on one of the outputs is a common occurance.
Reply posted by Chip on September 18, 2001
Earl,
I'd take some degree of exception to the phrase "phase is
time, time is phase". While this is essentially true, I submit
that there can be differences.
For example, It's entirely possible to have two completely time
coherant signals. It's just as possible to adjust the phase of one
of those signals, without adjusting it's time. Agreed?
I'm still trying to completely get my head around this one. But
to the best of my understanding, the real trick seems to be realizing
the difference. Here's what I've found to be the marker between
the two .... phase angle. If the time is correct, the phase angle
of the two sources will be parallel. if the phase angle is leaning
forward, or backward, it would indicate early or late arrival. In
the case where the phase angle is parallel but they don't overlap,
phase adjustment would be the appropriate tool to slide the phase
angle without changing the angle. Is this making sense?
Any input would be helpfull.
Chip
|